2nd floor passenger terminal - Noi Bai international airport

Name of project:
Construction of Passenger Terminal T2 – Noi Bai International Airport (2011-2014)
Investor
Northern Air Service Corporation
Project location
Hanoi
Project Scale
T2 passenger terminal project has 4 floors
Ground area is about 139,000 m2
Capacity 10-15 million passengers per year

The T2 passenger terminal project has 4 floors with an area of ​​​​about 139,000 m2, designed in a wing-shaped model with the idea of ​​​​harmony with nature, making the most of natural light, and saving energy. The terminal will be invested with advanced aviation technology and equipment systems, according to international standards. According to the plan by 2020, T2 terminal will reach a capacity of 10-15 million passengers per year.

Construction items include:

  • Construction of 50% of bored piles and reinforced concrete work in the main station
  • Construction of all reinforced concrete works in the station auxiliary area (FSS fuel supply area and STP waste treatment area).
  • Construction of all reinforced concrete work in functional areas outside the house (miscellaneous external buildings) - 16 bridges to airplanes, canteens, garages, ticket gates, underground water tanks...
  • Construction of the east wing.
  • Construction of the whole landscape (Landscaping)
  • Installation of batching plant and supply of all commercial concrete for the project.