SOME BID PACKAGES OF CIVIL CONSTRUCTION - Trang chủ | Vinaconex

EN

SOME BID PACKAGES OF CIVIL CONSTRUCTION

Construction time
2021-2024

1. Bid Package No. 11: Construction of structure, architecture, finishing, supply and installation of elevators and generators of the building; Construction of technical infrastructure. Project: C2 official residence in Xuan Phuong area - Military Technical Academy
- Project scale: Construction of structure, architecture, finishing, supply and installation of elevators, generators of the building; Construction of technical infrastructure.
- Project location: Military Technical Academy, Phuong Canh Ward, Nam Tu Liem District, Hanoi city.
- Construction time: from May 2021 to February 2023.
- Joint Venture of Vinaconex - Dong Do - Gama Vietnam

2. Bid Package: Construction and equipment installation (excluding furniture as tables, chairs, beds and cabinets) of D7.1 and D7.2, D8.1 and D8.2 buildings under the Investment Construction Project of Student Dormitory of Vietnam National University, Hanoi (QG-HN05)
- Project scale: Construction and equipment installation (excluding furniture as tables, chairs, beds and cabinets) of D7.1 and D7.2, D8.1 and D8.2 buildings.
- Project location: Thach Hoa commune, Thach That district, Hanoi city
- Construction time: from April 2022 to December 2022
- Joint venture of VINACONEX Corporation - Construction Development Consultation And Fire Equipment Joint Stock Company

3. Bid Package: Construction and installation of 15 villas in Lot H under the work: Villas in Lot H (15 model, medium type 1 villas), Project: Sai Gon Villas Hill.
- Project scale: Construction and installation of 15 villas in Lot H under the work: Villa in Lot H (15 Villa model 1 medium type).
- Project location: SAIGON VILLAS HILL luxury villa area, Tang Nhon Phu A ward, District 9, Ho Chi Minh city.
- Construction time: from October 2022 to May 2023.

4. Bid Package No. 12: Construction of structural works of foundation, basement, construction method statement, body structure, and diaphragm wall under the Investment Construction Project of the Institute of Clinical Infectious Diseases, 108 Military Central Hospital.
- Project scale: Construction of structural works of foundation, basement, construction method statement, body structure, and diaphragm wall.
- Project location: No. 1 Tran Hung Dao street, Hai Ba Trung district, Hanoi city
- Construction time: from May 2022 to April 2023.
- Joint Venture of VINACONEX Corporation - Quang Thanh Construction Co., Ltd.

Loading...