Name of project:
Construction and equipment for water supply system in Ninh Hoa town
Investor
Khanh Hoa Small and Medium Urban Development Project Management Board, Ninh Hoa Implementation Subcommittee
Project location
Ninh Hoa town, Khanh Hoa province

- Value of implementation: 71,825,048,749 VND

- Location: Ninh Hoa town, Khanh Hoa province

- Time to start and end: 11/2011-05/2013

- Details: Construction of Ninh Hoa Town Water Supply System Belongs to the project of developing small and medium-sized cities - the central region - Ninh Hoa sub-project is implemented under contract H5/A/10/ICB Civil works and equipment for water supply system in Ninh Hoa town.

The scale of the project includes: Raw water pumping station, raw water pipeline, sedimentation treatment cluster, conveying pipeline, and distribution pipeline with the total length of the pipeline from D 100 to D 300 is 30,835 meters. Design capacity 4.130m3/day/night. Total value of construction and installation is 71 billion VND (of phase I).

Construction items include:

- Construction of raw water pumping station at the foot of Da Ban dam.

- Construction of raw water pipeline from Da Ban lake to treatment station, total length of 5 km.

- Build a clean water treatment station of 4,000 m3/day.

- Clean water distribution and transmission pipeline with a total length of 26.6km

 