Construction time: from June 15, 2021 to June 21, 2023
Contract value (joint venture): VND 1,144,394.436,000
Contract value (VINACONEX in charge): VND 560,012,604,632
Design speed: 80kph.
In the Phase 1, the section would have 4 lanes with the roadbed width B = 17m.
Total section length: 15.6 kilometers.
Building 2 overpasses on the expressway, 3 overpasses at grade separation and at the interchange.
Span structure: I beams, Super-T beams with prestressed concrete.
Other items: Intersection; Drainage system; Underpasses; frontage roads, technical infrastructure; Traffic safety system.