PACKAGE NO. 5.10 “CONSTRUCTION AND EQUIPMENT INSTALLATION FOR THE PASSENGER TERMINAL BUILDING”

Name of project:
Gói thầu số 5.10 "Thi công xây dựng và lắp đặt thiết bị công trình Nhà ga hành khách". Dự án thành phần 3 - Các công trình thiết yếu trong cảng hàng không thuộc Dự án đầu tư xây dựng cảng HKQ
Investor
Airports Corporation of Vietnam – JSC.
Project location
Long Thanh district, Dong Nai province
Project Scale
Construction of a passenger terminal with a design capacity to cater 25 million passengers per year, arranged in a centralized layout spanning four floors—comprising a central area and three wings. It is designed with two separate arrival and departure concourses, aligning with 4.0 technological; The station model is smart, modern, comfortable for passengers, ensuring efficient and eco-friendly operations. (Total floor area: 376,451.32 sqm)
VIETUR Joint venture
1. IC ICTAS Construction Industry and Trade Group
2. RICONS Construction Investment Joint Stock Company
3. NEWTECONS Investment Construction Joint Stock Company
4. SOL E&C Investment Construction Joint Stock Company
5. Vietnam Construction and Import-Export Joint Stock Corporation
6. ATAD Steel Structure Joint Stock Company
7. Construction Corporation No. 1 Joint Stock Company
8. HAWEE Mechanical and Electrical Joint Stock Company
9. Phuc Hung Holdings Construction Joint Stock Company
10. Hanoi Construction Joint Stock Company No. 1
Construction time
28/08/2023 - 28/11/2026