TENDER PACKAGE NO. 10.XL: BIEN HOA – VUNG TAU EXPRESSWAY PROJECT

Name of project:
Tender Package No. 10.XL: Bien Hoa – Vung Tau Expressway Project
Investor
Project Management Unit No. 85
Project location
Starting Point of Section: at Kilometer 23+000, linking to the ending point of Section 1 in Long Phuoc Commune, Long Thanh District, Dong Nai Province. Ending Point of Section: at Kilometer 3
Project Scale
Grade I construction (TCVN5729-2012), design speed phase 1: 100Km/h
Length of Section: 11.2km.
The cross section in phase 1 has 4-6 lanes, symmetrical cross-section in complete stage, ensuring convenience and cost-savings. In the completion phase, an additional lane will be added on each side, the cross-sectional width ranges from 24.75m to 34.5m.
Bridge part: 05 bridges including 01 bridge on the expressway, 04 overpasses, 05 bridges in intersections.
Underpasses: 03
Vinaconex - CC1 - Dacinco Joint Venture
Construction time
30/6/2023 - 30/12/2025
Ownership

IMAGES OF PROJECT'S LANDSCAPE