BID PACKAGE NO. 14-XL OF MAI SON - NATIONAL HIGHWAY 45 EXPRESSWAY

Name of project:
Bid Package No. 14-XL for construction of the Mai Son - National Highway section under the Eastern North - South expressway construction project in the 2017-2020 period.
Investor
Thang Long Project Management Unit (Ministry of Transport)
Project location
Thieu Hop commune, Thieu Hoa district, Thanh Hoa province.
Project Scale
Construction classification: Roadworks, grade 1
Construction location & scope:
The starting point overlaps the ending point of package no.5 at at Km318+000 in Thieu Hop commune, Thieu Hoa district, Thanh Hoa province.
The ending point overlaps the starting point of NH45 - Nghi Son section construction project at Km337+478.11 in Tan Phuc commune, Nong Cong district, Thanh Hoa province.
Contract value (joint venture): VND 2,498,326,031,898
Contract value (VINACONEX in charge): VND 1,573,945,400,096
Construction time
28/12/2020 – 31/12/2022

Scale:
Expressway:
Expressway would have 4 lanes, the design speed at 80kph, and the roadbed width B = 17m in the Phase 1.
Total section length: About 19.49 kilometers.
Overpasses:
Building 5 overpasses on the expressway, 7 pedestrian overpasses and overpasses on frontage roads, 1 overpass at slip road and 1 overpass at the interchange.
- Span structure: continuous box beams, I beams, Super-T beams with prestressed concrete.
- Total length of the overpasses: 4,693.795m
Other items: Intersections (1 interchange, 7 grade separation); Drainage system (newly built 19 box culverts, 57 round ones); frontage roads (total length of about 19.6 kilometers); 19 underpasses; Intersection lighting system; Intelligent traffic system and Toll collection system;