Construction classification: Roadworks, grade 1	
                                                                Construction location & scope:
                                                                The starting point overlaps the ending point of package no.5 at at Km318+000 in Thieu Hop commune, Thieu Hoa district, Thanh Hoa province.
                                                                The ending point overlaps the starting point of NH45 - Nghi Son section construction project at Km337+478.11 in Tan Phuc commune, Nong Cong district, Thanh Hoa province.
                                                                Contract value (joint venture): VND 2,498,326,031,898
                                                                Contract value (VINACONEX in charge): VND 1,573,945,400,096