Ban Chat hydroelectric project is one of two works in the hydropower ladder on the Nam Mu river. With a designed capacity of 220MW, when put into operation, Ban Chat Hydropower Plant will annually supply 1,158.1x106 KWh of electricity to the national grid system.
Vinaconex Joint Stock Corporation is a member contractor in the consortium of construction contractors Package 14- Construction and installation of main works, temporary works, construction of items serving construction phase 2, preservation and installation. technological equipment and trial run of Ban Chat Hydropower plant, including the following items: Construction of excavation and backfilling of soil and rock; treatment of foundation pits and reinforced concrete construction of plant items, factory discharge canals, inlet and water intake channels.