DAK BA HYDROPOWER PROJECT

Name of project:
Dak Ba Hydropower Project
Investor
Bach Thien Loc Joint Stock Company
Research land area
DAK BA HYDROPOWER PROJECT
Project Scale
Dak Ba HP was undertaken on the Dak Ba stream (locally known as Dak Bua), which is a level 1 line of the Dakdrinh River’s upstream that belongs to Son Bua and Son Mua communes, Son Tay district, Quang Ngai province, with Bach Thien Loc Joint Stock Company (a unit with 100% capital of Vinaconex Corporation) as the investor, Vinaconex as the general contractor.
Construction time
2020-2022

The Dak Ba hydropower plant has an installed capacity of 30MW and an average annual power output of 100.43 million kWh. With an expected annual revenue of approximately VND 130 billion, the plant is projected to contribute over VND 20 billion to the local budget, bolstering the socio-economic growth and economic restructuring of Son Tay District, which is a remote, mountainous area of Quang Ngai province. 

The project's operational framework contains a run-of-river combined with a spillway dam on Dak Ba stream, an energy route in penstocks on the left dam side (the energy route includes water intake – penstocks - outflow), an open-air power plant located in the Son Tay district's urban area, and spillway channels returning water to Lay stream that flows into the Dak Drinh river.


 

 

 