Overall Project Scope:
1. CONSTRUCTION EXPANSION:
-Expand the existing terminal on both sides, extending eastward and westward.
+Terminal expansion construction: Approximately 61,100 sqm of floor area
+Functional conversion: Approximately 16,800 sqm of floor area
+Construction and expansion of supporting systems (mechanical systems, electrical systems, water supply and drainage systems, transportation systems, etc.)
-Sewage Treatment Plant (STP): Expand STP capacity from 2,600 m³/day to 3,900 m³/day.
2. EQUIPMENT SYSTEM EXPANSION:
-Expand baggage handling systems, check-in systems, passenger boarding bridges, aircraft parking systems, security screening systems, and other related systems.
-The scope includes but is not limited to the following main tasks:
-Develop detailed construction designs
-Execute construction of the T2 terminal expansion and auxiliary facilities
-Perform renovation and functional conversion works within the existing T2 terminal
-Ensure integration and synchronization between the expanded/renovated sections and the existing T2 terminal, guaranteeing that the upgraded facility operates efficiently and cohesively at its expanded capacity of 15 million passengers per year.