Total investment: VND 99,019,261,000,000
Investment scale:
Transport works:
Building a 4,000-meter runway with a width of 75 meters; a system of taxiways and aprons with a total width of 44 meters; passenger terminal designed to handle 25 million passengers and 1.2 million tons of cargo per annum; Leveling the ground, building airport perimeter fences and drainage systems to meet the operational requirements for 4F class airport as specified by the International Civil Aviation Organization (ICAO).Building the system of service roads in the apron, inner roads, parking lots, trunk roads, a viaduct system that leads to the terminal and overpasses on the trunk roads, etc.