Vinaconex P&C Joint Stock Company (Corporate contributing capital at the time of project start)
Project location
Xuan My Commune, Thuong Xuan District, Thanh Hoa Province
Research land area
Project Scale
Total estimated investment: 1,600 billion VND
The lake has a capacity of nearly 1.5 billion m3
2 commercial generating sets with a total capacity of 97 MW, supplementing the national grid's supply by an average of about 430 million KWh per year.
- Total estimated investment: 1,600 billion VND (at the time of 2010)
- Design capacity and project scale:
Cua Dat reservoir is located in Chu river area (in Xuan My commune), about 17 km upstream from Bai Thuong dam. The lake has a capacity of nearly 1.5 billion m3, which is responsible for reducing floods for the downstream region, ensuring sufficient water supply for irrigation over 86,000 hectares of agricultural land, as well as water demand for industry and daily life. . In addition, this reservoir also has the task of helping to push salinity for the lower Chu River and combining with Cua Dat Hydropower Plant with 2 commercial generating sets with a total capacity of 97 MW, supplementing the supply to the grid. National electricity averages about 430 million KWh per year.
- Consulting unit: Vinaconex 36 investment consulting joint stock company