Total investment: about 1,500 billion VND
Scale of construction: the plant is built in two phases: phase 1 with a capacity of 300,000 m3/day, phase 2 with a capacity of 300,000 m3/day with more than 47.5km long water pipeline; D1500-1800mm.
Design capacity: 600,000m3/day and night
Application technology: Da river water is treated and disinfected with modern technology, the water pipe is a fiberglass reinforced pipe manufactured by Vinaconex.